SHIVAJICHOUDHURY's picture From SHIVAJICHOUDHURY rss RSS  subscribe Subscribe

DISTRIBUTED CONTROL SYSTEM-THERMAL POWER PLANT 



 
Tags:  dcs  control  power plant  mmi  hmi  auto  lvs  auto control 
Views:  1188
Downloads:  5
Published:  June 24, 2008
 
8
save to favorite
ask author to add audio Ask author to add audio
Share plick with friends Share
mark as inappropriate Mark as inappropriate
 
Related Plicks
If Women Control the World

If Women Control the World

From: lynnshi
Views: 3821 Comments: 1

 
INSTRUMENTATION & CONTROL FOR THERMAL POWER PLANT

INSTRUMENTATION & CONTROL FOR THERMAL POWER PLANT

From: SHIVAJICHOUDHURY
Views: 4507 Comments: 1

 
See all 
 
More from this user
INDIANS IN SITTING POSTURE

INDIANS IN SITTING POSTURE

From: SHIVAJICHOUDHURY
Views: 540
Comments: 0

ENVIRONMENT MANAGEMENT -COAL FIRED THERMAL POWER PLANT

ENVIRONMENT MANAGEMENT -COAL FIRED THERMAL POWER PLANT

From: SHIVAJICHOUDHURY
Views: 560
Comments: 0

MECHATRONICS

MECHATRONICS

From: SHIVAJICHOUDHURY
Views: 1005
Comments: 0

THERMAL POWER PLANT SAFETY

THERMAL POWER PLANT SAFETY

From: SHIVAJICHOUDHURY
Views: 1715
Comments: 1

CONDITION MONITORING  IN THERMAL POWER PLANT

CONDITION MONITORING IN THERMAL POWER PLANT

From: SHIVAJICHOUDHURY
Views: 2664
Comments: 0

WORLD AT NIGHT

WORLD AT NIGHT

From: SHIVAJICHOUDHURY
Views: 1154
Comments: 0

See all 
 
Place your Ad here for $2.00 a month
Sample Ad
Advertise your business on myplick.
Only $2.00 a month.
 
 URL:          AddThis Social Bookmark Button
Embed Thin Player: (fits in most blogs)
Embed Full Player :
 
 

Name

Email (will NOT be shown to other users)

 

 
 
Comments:
 
 
Notes:
 
 
Slide 1: DISTRIBUTED CONTROL SYSTEM ( DCS ) FOR THERMAL POWER PLANT SHIVAJI CHOUDHURY
Slide 2: OBJECTIVE OF DISTRIBUTED CONTROL SYSTEM(DCS) • • • • • • Safe operation of plant Lowest cost of generation Longest equipment life Minimum environmental effect Maximum efficiency Energy conversation DCS
Slide 3: BENEFITS OF DCS • • • • High reliability Improved response time Improve operator interface to plant Improve accessibility of plant data to engineering & management personals • Historical storage and retrieval system DCS
Slide 4: DCS HARDWARE • • Controller card Input cards (4-20mA, Thermocouple, RTD,Digital,SOE). Output cards(4-20 mA ,digital) Power supply module. Communication card Cables Controller with input/output card • • • • • DCS
Slide 5: MAN MACHINE INTERFACE • CRT/TFT MONITOR (OPERATOR WORK STATION) • LVS (Large Video Screen) • PRINTER DCS
Slide 6: DCS Architecture LOCAL JB LOCAL JB + LOCAL JB CJC BOX LOCAL JB E T/Cs RTDs P POWER AMP. MOTORISED VALVES/ DAMPERS CONTACT INPUTS ANALOG (4-20mA) DCS
Slide 7: OPERATOR WORK STATION • • • • • • • • • Alarm monitoring Mimic /graphic display Trend display Operator guidance display System & diagnostic display Control Bar chart Sequence display Fault analysis display DCS
Slide 8: DISPLAY-mimic DCS
Slide 9: DISPLAY-mimic DCS
Slide 10: TRENDING DCS
Slide 11: LOGS / SUMMARIES / REPORTS • EVENT ACTIVATED LOGS -.alarm log ,trip analysis log, start up log • TIME ACTIVATED LOGS-shift log, daily log • OPERATOR DEMAND LOGS- summary log, performance log, maintenance log • SEQUENCE OF EVENTS LOG DCS
Slide 12: REPORTS DCS
Slide 13: AUTO CONTROL LOOP • • • • • • • Coordinated control Total air control Super/reheater temperature control Mill out temperature control Hot well/heater /deaerator level control Drum level control Furnace draft control DCS
Slide 14: INTERLOCK & PROTECTION • Interlock & protection are used for safe startup /operation /shutdown /trip /of any equipment or auxiliaries, e.g. • CW pump, ID Fan , FD fan, BFP, CEP, Mill ,PA FAN • Heater • Valve & drains DCS
Slide 15: BOILER CONTROLS • • • • • Burner management system Secondary air damper control Aux pressure desuper heating system Soot blower control Hp by pass DCS
Slide 16: TURBINE CONTROL SYSTEM • • • • • • • Turbine governing system Turbine protection Automatic turbine run up system Turbine stress controller Lp bypass Sequence controls for turbine driven BFP Generator aux monitoring DCS
Slide 17: PERFORMANCE CALCULATION • • • • • • • • Boiler efficiency Turbine HP/IP/LP turbine Feed heaters Deaerator Condenser Air preheater Unit heat rate DCS
Slide 18: TYPICAL DCS OF 500 MW UNIT • • • • No of inputs No of outputs Operator Work Station Large Video Screen 13750 7250 8 5 DCS
Slide 19: THANKS DCS

   
Time on Slide Time on Plick
Slides per Visit Slide Views Views by Location
close
Please fill out the form below. You will be asked to make your payment to Myplick (Eastar Technologies) via Paypal. Your request will be processed within 24 hours after your submission.
 
Title (max 25 characters)
Link (placed on title)
Content (max 100 characters)
You have successfully submitted your ad request. Please send your payment to ericandlei@myplick.com via PAYPAL.
Ad submission failed. Please report the problem to ericandlei@myplick.com.