SHIVAJICHOUDHURY's picture From SHIVAJICHOUDHURY rss RSS  subscribe Subscribe

CONDITION MONITORING IN THERMAL POWER PLANT 



 
Tags:  DGA  VIBRATION  POWER PLANT 
Views:  2626
Downloads:  50
Published:  May 22, 2008
 
7
save to favorite
ask author to add audio Ask author to add audio
Share plick with friends Share
mark as inappropriate Mark as inappropriate
 
Related Plicks
plant in sand

plant in sand

From: wdilliam
Views: 1153 Comments: 0

 
5thgradechapter1les son1

5thgradechapter1lesson1

From: hiratufail
Views: 377 Comments: 0

 
5thgradechapter1les son1

5thgradechapter1lesson1

From: hiratufail
Views: 398 Comments: 0

 
See all 
 
More from this user
INDIANS IN SITTING POSTURE

INDIANS IN SITTING POSTURE

From: SHIVAJICHOUDHURY
Views: 513
Comments: 0

DISTRIBUTED CONTROL SYSTEM-THERMAL POWER PLANT

DISTRIBUTED CONTROL SYSTEM-THERMAL POWER PLANT

From: SHIVAJICHOUDHURY
Views: 1135
Comments: 0

ENVIRONMENT MANAGEMENT -COAL FIRED THERMAL POWER PLANT

ENVIRONMENT MANAGEMENT -COAL FIRED THERMAL POWER PLANT

From: SHIVAJICHOUDHURY
Views: 538
Comments: 0

MECHATRONICS

MECHATRONICS

From: SHIVAJICHOUDHURY
Views: 982
Comments: 0

THERMAL POWER PLANT SAFETY

THERMAL POWER PLANT SAFETY

From: SHIVAJICHOUDHURY
Views: 1670
Comments: 1

WORLD AT NIGHT

WORLD AT NIGHT

From: SHIVAJICHOUDHURY
Views: 1140
Comments: 0

See all 
 
Place your Ad here for $2.00 a month
Sample Ad
Advertise your business on myplick.
Only $2.00 a month.
 
 URL:          AddThis Social Bookmark Button
Embed Thin Player: (fits in most blogs)
Embed Full Player :
 
 

Name

Email (will NOT be shown to other users)

 

 
 
Comments:
 
 
Notes:
 
 
Slide 1: CONDITION MONITORING IN THERMAL POWER PLANT SHIVAJI CHOUDHURY
Slide 2: OBJECTIVE OF CONDITION MONITORING • TO IDENTIFY CHANGES IN CONDITION OF MACHINE THAT WILL INDICATE SOME POTENTIAL FAILURE. • DIAGNOSIS OF FAULT • PREDICTION OF FAULT • TO AVOID FURTHER DAMAGES • TO PLAN BETTER SPARE MANAGEMENT • OUTAGE OF EQUIPMENT CAN BE BETTER PLANNED. • ENHANCING THE MACHINE EDURANCE LIMIT. • LESS DOWN TIME AND MORE PRODUCTIVITY • GREATER SAFETY TO WORK FORCE.
Slide 3: MONITORING TECHNIQUE • • • • • • • VIBRATION MONITORING. LUBRICANT ANALYSIS. NOISE ANALYSIS. WEAR DEBRIS ANALYSIS. THERMOGRAGHY. D G A. NDT ULTRASONIC
Slide 4: VIBRATION ANALYSIS • • • • • • TURBINE. GENERATOR. PUMP. MOTOR. FAN. COMPRESSOR.
Slide 5: VIBRATION DIAGNOSIS • SHAFT AND ROTORMISALIGNMENTS UNBALANCE , BENT, • BEARING –DAMAGES,,DISTORTION,LOSS OF LUBRICANT. • GEAR –TOOTH MESHING FAULT,WORN TEETH,MISALIGNMENT • MECHANICAL LOOSNESS
Slide 6: LUB OIL ANALYSIS • • • • • MOISTURE MECHANICAL IMPURIRTIES DENSITY VISCOCITY ACIDITY
Slide 7: LUB OIL DIAGNOSIS • DEGRADATION OF LUB OIL • IMPURITIES IN LUB OIL
Slide 8: WEAR DEBRIS ANALYSIS & DIAGNOSIS • • • • WEAR DEBRIS CARRIED OUT FOR WEAR PARTICLE CONCENTRATION IN OIL CONDITION OF LUB OIL OUTSIDE CONTENMATION TO DETERMINE TO WEAR CONDITION OF MACHINE 1. 2. 3. 4. NORMAL RUBBING BEARING FAILURE CONDITION OF GEAR CUTTING OF METAL
Slide 9: THERMOVISION MONITORING • IDENTIFICATION OF HOT SPOT . • USED FOR MONITORING OF SWITCHYARD EQUIPMENT. • ROUTINE MONITORING OF MOTOR/PUMP. • MONITORING OF DRAIN PIPES LINES TO DETECT CHOKING OF PIPE LINES. • TO MONITOR OF CONDITION OF INSULATION ON PIPE AND EQUIPMENT.
Slide 10: DISSOLVE GAS ANALYSIS • FOR ALL TRANSFORMERS. • DIELECTRIC STRENGTH OF TRANSFORMER OIL. • MOISTURE,DENSITY,COLOUR OF TRANSFORMER OIL. • DISSOLVE GAS ANALYSIS IN TRANSFORMER OIL-TO DIAGNOSIS OF FAULT.
Slide 11: TRANSFORMER OIL DIAGNOSIS • CO AND CO2 IN OIL—THERMALCONDITION INVOLVING PAPER • METHANE,ETHANE,ETHYLENE AND SMALL AMOUNT OF ACETYLENE IN OIL - THERMAL CONDITION INVOLVING THE OIL • HYDROGEN,METHA AND SMALL AMOUNT OF ACETYLENE AND ETHANE IN OIL--PARTIAL DISCHARGE • HYDROGEN,ACETYIENE AND ETHELENE IN OILSUSTAINED ARCING-SUSTAINED ARCING
Slide 12: CONDITION MONITORING SCHEDULE • VIBRATION MONITORING • CHEMICAL ANALYSIS OF OIL • THERMOGRAPHY DAILY/WEEKLY/MONTHLY QUARTELY QUARTELY QUARTELY ANNUALY • DGA • NSD ULTRASONIC
Slide 13: THANKYOU

   
Time on Slide Time on Plick
Slides per Visit Slide Views Views by Location
close
Please fill out the form below. You will be asked to make your payment to Myplick (Eastar Technologies) via Paypal. Your request will be processed within 24 hours after your submission.
 
Title (max 25 characters)
Link (placed on title)
Content (max 100 characters)
You have successfully submitted your ad request. Please send your payment to ericandlei@myplick.com via PAYPAL.
Ad submission failed. Please report the problem to ericandlei@myplick.com.