SHIVAJICHOUDHURY's picture From SHIVAJICHOUDHURY rss RSS  subscribe Subscribe

ENVIRONMENT MANAGEMENT -COAL FIRED THERMAL POWER PLANT 



 
Views:  538
Downloads:  2
Published:  June 24, 2008
 
1
save to favorite
ask author to add audio Ask author to add audio
Share plick with friends Share
mark as inappropriate Mark as inappropriate
 
Related Plicks
INSTRUMENTATION & CONTROL FOR THERMAL POWER PLANT

INSTRUMENTATION & CONTROL FOR THERMAL POWER PLANT

From: SHIVAJICHOUDHURY
Views: 4443 Comments: 1

 
THERMAL POWER PLANT SAFETY

THERMAL POWER PLANT SAFETY

From: SHIVAJICHOUDHURY
Views: 1670 Comments: 1

 
CONDITION MONITORING  IN THERMAL POWER PLANT

CONDITION MONITORING IN THERMAL POWER PLANT

From: SHIVAJICHOUDHURY
Views: 2627 Comments: 0

 
GTAA F.E.S.T.I.

GTAA F.E.S.T.I.

From: anon-18616
Views: 1152 Comments: 0

 
DISTRIBUTED CONTROL SYSTEM-THERMAL POWER PLANT

DISTRIBUTED CONTROL SYSTEM-THERMAL POWER PLANT

From: SHIVAJICHOUDHURY
Views: 1135 Comments: 0

 
See all 
 
More from this user
INDIANS IN SITTING POSTURE

INDIANS IN SITTING POSTURE

From: SHIVAJICHOUDHURY
Views: 513
Comments: 0

DISTRIBUTED CONTROL SYSTEM-THERMAL POWER PLANT

DISTRIBUTED CONTROL SYSTEM-THERMAL POWER PLANT

From: SHIVAJICHOUDHURY
Views: 1135
Comments: 0

MECHATRONICS

MECHATRONICS

From: SHIVAJICHOUDHURY
Views: 982
Comments: 0

THERMAL POWER PLANT SAFETY

THERMAL POWER PLANT SAFETY

From: SHIVAJICHOUDHURY
Views: 1670
Comments: 1

CONDITION MONITORING  IN THERMAL POWER PLANT

CONDITION MONITORING IN THERMAL POWER PLANT

From: SHIVAJICHOUDHURY
Views: 2627
Comments: 0

WORLD AT NIGHT

WORLD AT NIGHT

From: SHIVAJICHOUDHURY
Views: 1140
Comments: 0

See all 
 
Place your Ad here for $2.00 a month
Sample Ad
Advertise your business on myplick.
Only $2.00 a month.
 
 URL:          AddThis Social Bookmark Button
Embed Thin Player: (fits in most blogs)
Embed Full Player :
 
 

Name

Email (will NOT be shown to other users)

 

 
 
Comments:
 
 
Notes:
 
 
Slide 1: ENVIRONMENT MANAGEMENT IN COAL FIRED THERMAL POWER PLANT SHIVAJI CHOUDHURY
Slide 2: GLOBAL ELECTRICITY GENERATION (IN TW)         Coal Natural gas Nuclear Hydro Oil Biogas Geothermal Solar/wind 6000 2800 2700 2600 1800 200 50 40  All over the world, coal is the main source of energy and also major source of pollution.
Slide 3: ENVIRONMENT MANAGEMENT in coal fired thermal power plant  2. 3. 4. 5. AIR POLLUTION CONTROL Electrostatic precipitators Low NOX burners Flue gas stack Dry ash extraction WATER POLLUTION CONTROL Coal/oil setting pits Ash dykes & disposal systems Ash water recycling system Effluent treatment plant THERMAL POLLUTION CONTROL NOISE POLLUTION CONTROL  8. 9. 10. 11.  
Slide 4: ELECTROSTATIC PRECIPITATORS    The ash left behind after combustion of coal is arrested in high efficiency Electrostatic precipitators (ESP) and particulate emission is controlled well within the stipulated norms. The ash collected in the ESP is disposed to ash ponds in slurry form. Emission standard (world bank) Particulate matter (max)-50 microgram per cubic meter.
Slide 5: FLUE GAS STACK   3. 4. Tall flue gas stack is provided for wide dispersion of gaseous emission (SO2, NO2 etc) into atmosphere. Stack height (in Meters) 500 MW and above – 275 200 MW and less than 500 MW-220
Slide 6: LOW NO2 BURNERS    4. 5. NO2 emissions are controlled by provision of low NO2 burners. By adopting best combustion practices. Emission standards –world bank (in micrograms per cubic meter) NO2 100 SO2 80
Slide 7: NO2 POLLUTION OVER INDIA
Slide 8: COAL & OIL SETTLING PITS  In these pits , coal dust and oil are removed from the effluents from coal handling plant ,coal yard and fuel oil handling areas before discharge into Effluent Treatment Plant (ETP).
Slide 9: ASH DYKES & ASH DISPOSAL SYSTEM    Ash ponds are provided for ash disposal. Ash ponds are divided into lagoons and provided with garlanding arrangements for change over of the ash slurry feed points for even filling of the pond and for effective of ash particles. Ash in slurry form is discharge into the lagoons where ash particle settled from the slurry and clear effluent water is discharge from ash ponds.
Slide 10: ASH WATER RECYCLEING SYSTEM   The effluent water from ash pond is circulated back to the power plant for further slucing to the ash pond. This helps in savings of fresh water requirement for transportation of ash from the plant.
Slide 11: DRY ASH EXTRACTION SYSTEM  2. 3. 4. 5. 6. Dry ash much higher utilization potential in ash based products e g Land reclamation. Structural land filling. Road making. Cement manufacturing. Bricks manufacturing.
Slide 12: NEUTRALIZATION PITS  Neutralization pits are provided in water treatment plant (WTP) for Ph correction of effluents before discharge into effluent treatment plant (ETP) for further treatment and use.
Slide 13: SOURCE OF LIQUID EFFLUINTS        Cooling tower blow down. Boiler blow down. Power area service water waste. Water treatment plant waste. DM plant regeneration plant. CHP/AHP waste. Effluent from silo area.
Slide 14: EFFLUENT TREATMENT PLANTS(ETP)  The objective of industrial liquid effluent treatment plant (ETP) is discharge clean effluent from the power plants to meet environmental standards and to reduce intake water requirement. The scheme involves collection of various effluents and their appropriate treatment centrally and recirculation of the treated effluent for various plant uses. 
Slide 15: EFFLUENTS STANDARDS (world bank) (milligrams per liter ,except PH)         PH Suspended solid Oil & grease Chlorine Chromium Copper Iron Zinc 6-9 50 10 0.2 0.5 0.5 1.0 1.0
Slide 16: THERMAL POLLUTION    Cooling towers are provided for cooling the hot condenser cooling water in closed cycle condenser cooling water system. This helps in reduction in thermal pollution an conservation of fresh water. Condenser outlet cooling water (once through ) should not be more than 3 degree than intake temperature (world bank standard) .
Slide 17: NOISE POLLUTION CONTROL   The entire plant is so procured/installed that resultant noise level within premises remains with standard limits. Standard (world bank) for industrial area - 70 dB max outside the project property boundary.
Slide 18: THANKS

   
Time on Slide Time on Plick
Slides per Visit Slide Views Views by Location
close
Please fill out the form below. You will be asked to make your payment to Myplick (Eastar Technologies) via Paypal. Your request will be processed within 24 hours after your submission.
 
Title (max 25 characters)
Link (placed on title)
Content (max 100 characters)
You have successfully submitted your ad request. Please send your payment to ericandlei@myplick.com via PAYPAL.
Ad submission failed. Please report the problem to ericandlei@myplick.com.